SECTIONS 4 & 6 · VERIFIABLE SCIENTIFIC & ENGINEERING FOUNDATION

Published Peer-Reviewed Research, Academic Monograph & Granted Software Copyrights

Four peer-reviewed journal articles, two peer-reviewed conference papers, and one 324-page academic monograph were published in 2026, accompanied by two granted software copyright registrations issued by the China Copyright Protection Center in October 2026. All publications carry resolvable DOIs and are publicly verifiable via Google Scholar.

Google Scholar ID KFbOneUAAAAJ ↗
50
Citations
5
h-index
2
i10-index
968
Views
Snapshot as of 10 November 2026; live profile remains authoritative.
PAPERS J3 & J4 (2,480 NODES, 358 CHANGE ORDERS) Empirical Production Data

Cross-Generation Firmware Governance vs. Baseline

PAPER C2 · AUPL LLM SERVING BENCHMARK (30 RUNS) LMSYS-Chat-1M & WildChat

Mean GPU Utilisation & SLO Attainment Across Baselines

Four Peer-Reviewed Journal Articles (J1–J4) & Two Peer-Reviewed Conference Papers (C1–C2)

J1 · Peer-Reviewed Journal Article Cited by 6

Exploration of Data Center Cost Optimization Pathways Under Multi-Generation CPU and GPU Collaborative Architectures

Engineering Advances, Vol. 6, Issue 1, pp. 41–44 (2026)
Authorship: Yaqi Hou — Sole Author & Corresponding Author · School of Information Science and Engineering, Central South University

Models total cost of ownership (TCO) in multi-generation CPU/GPU estates as a function of scheduling behaviour across hardware depreciation, energy/cooling, load-scheduling loss, and resource idleness. Specifies 3 mechanisms: four-group task mapping with 3-level compatibility/performance/redundancy matching, per-watt energy-efficiency scoring, and a post-job cost snapshot feedback loop.

DOI: 10.26855/ea.2026.03.009 Resolve DOI ↗
J2 · Peer-Reviewed Journal Article Cited by 8

Research on Heterogeneous Server Upgrade Strategies and Resource Utilization Efficiency Oriented Toward Green Computing Objectives

Advances in Computer and Communication, Vol. 7, Issue 1, pp. 47–51 (2026)
Authorship: Yaqi Hou — Sole Author & Corresponding Author · School of Information Science and Engineering, Central South University

Replaces static model-name identification with a 3D device profile (computing capability, energy-efficiency parameters, concurrent structure) classifying nodes into T1/T2/T3 tiers across 7 load classes. In a two-week deployment, T1 GPU array utilisation rose 12%, lowest-tier scheduling frequency dropped ~30%, unit task energy fell 8–11% (peak >18% under thermal intervention), and task failure rate dropped ~0.7%.

DOI: 10.26855/acc.2026.03.007 Resolve DOI ↗
J3 · Peer-Reviewed Journal Article Cited by 13

Research on Server Performance Stability Assurance Mechanisms during Cross-Generation Computing Platform Upgrades

International Journal of Multimedia Computing, Vol. 7, Issue 1, pp. 27–32 (2026) · ISSN 2789-7168
Authorship: Yaqi Hou — First / Sole Author · School of Information Science and Engineering, Central South University

Empirical study across 2,480 sampled servers and 358 firmware change orders in three production data center regions (920 nodes at 46% Gen9/Gen10 mix; 740 nodes at 39% Gen10/Gen11 mix; 820 nodes at 51% three-generation mix). Demonstrates monotonic rise in baseline failure rate (3.1% -> 3.4% -> 3.8%) and validates rack-level canary, partitioned rolling waves, and linked OOB health checks.

DOI: 10.38007/IJMC.2026.070104 Resolve DOI ↗
J4 · Peer-Reviewed Journal Article Cited by 12

Research on BIOS and BMC Compatibility Optimization Methods for Cross-Generation Servers in Production Environments

International Journal of Big Data Intelligent Technology, Vol. 7, Issue 1, pp. 71–77 (2026) · ISSN 2790-0932
Authorship: Yaqi Hou — First / Sole Author · School of Information Science and Engineering, Central South University

Establishes the 4-part composite compatibility knowledge base (server generation, mainboard version, BMC major version, BIOS major version) with static/dynamic conflict detection aligned to DMTF Redfish UpdateService, UEFI capsule update, and NIST SP 800-193. Raised upgrade success from 96.6% to 99.2%, cut mean recovery time from 18.4 min to 6.3 min (-65.8%), lifted KVM availability to 99.91%, reduced sensor MAE from 1.9°C to 0.8°C, and increased auditable compliance from 71% to 93%.

DOI: 10.38007/IJBDIT.2026.070109 Resolve DOI ↗
C1 · Peer-Reviewed Conference Paper (Elsevier) Cited by 9

Collaborative Regulation for Stable Data Center Operation under Energy Efficiency Constraints

Procedia Computer Science, Vol. 281, pp. 612–620 (2026) · MMIA 2026, Elsevier
Authorship: Yaqi Hou — Sole Author & Corresponding Author · School of Information Science and Engineering, Central South University

Hierarchical multi-timescale controller jointly optimising workload orchestration, thermal-aware cooling control, and grid-aware power budgeting under a distributed consensus safety guard. Reduced SLA violation rate from 1.53% to 0.75% (p=0.003), P99 latency from 95.8 ms to 82.7 ms (p=0.002), PUE from 1.376 to 1.275 (p=0.007), cooling share from 28.5% to 22.4%, carbon emissions from 0.92 to 0.79 kg/h, while lifting demand-response revenue from $0 to $0.26/h.

DOI: 10.1016/j.procs.2026.04.254 Resolve DOI ↗
C2 · Peer-Reviewed Conference Paper (Springer LNNS) Cited by 2

Adaptive Upgrading of Computing Power Platforms for Large Model Workloads

Lecture Notes in Networks and Systems (ComSIA 2026 Proceedings), Springer Nature Switzerland, pp. 429–437 (Online 2026; Vol. dated 2027)
Authorship: Yaqi Hou — Sole Author & Corresponding Author · School of Information Science and Engineering, Central South University

Proposes AUPL, a closed-loop upgrade framework for LLM serving on LMSYS-Chat-1M and WildChat corpora across MIG-partitioned multi-generation GPUs. Lifted mean GPU utilisation to 0.598 (+6.3 to +15.6 percentage points), cut P99 latency to 1765.2 ms (-16% to -34%), improved SLO attainment to 0.919 (+4% to +12%), and reduced normalised cost to 0.960 (p < 0.01 vs. static & reactive baselines).

DOI: 10.1007/978-3-032-31170-2_35 Resolve DOI ↗
PAPER C2 QUANTITATIVE EVALUATION TABLE · SPRINGER LNNS (DOI 10.1007/978-3-032-31170-2_35)

AUPL Closed-Loop LLM Upgrade Framework vs. Four Baselines (30 Runs, Mean ± SD)

Method Mean GPU Utilisation P99 Latency (ms) SLO Attainment Normalised Cost
Static provisioning 0.442 ± 0.025 2668.2 ± 94.3 0.795 ± 0.009 1.105 ± 0.017
Reactive autoscaling 0.501 ± 0.026 2539.4 ± 79.9 0.801 ± 0.013 1.041 ± 0.023
Chunked prefill scheduler 0.527 ± 0.033 2092.9 ± 78.7 0.865 ± 0.013 1.034 ± 0.020
Prefill-decode disaggregation 0.566 ± 0.023 2103.4 ± 80.7 0.878 ± 0.010 0.999 ± 0.020
AUPL (Proposed Closed-Loop Planner) 0.598 ± 0.020 1765.2 ± 107.9 0.919 ± 0.010 0.960 ± 0.023
Ablation Results: Removing drift detection degrades P99 to 1892.6 ms (SLO 0.899); removing the sliding-window forecasting module causes the largest penalty at 1972.4 ms (SLO 0.893); removing the online RL feedback controller degrades P99 to 1816.0 ms (SLO 0.907).
ACADEMIC MONOGRAPH (B1 · AUGUST 2026)

Cloud Native Intelligent Computing System: Infrastructure, Data Platform, and System Innovation

Publisher: Scholar Publishing Group (1st Edition, Aug 2026)
Length: 324 Pages · ~74,000 Words · 7 Chapters
Authors: Linlin Sun, Xiao Ma, Yaqi Hou (3rd Author), Zhixian Zhang
ISBN: 978-1-80053-504-6

Chapter 2 (Data Center Architecture & Computing Resource Management) and Chapter 6 (System Performance Optimisation & High Availability) codify nine years of hardware qualification judgement into teachable engineering standards used to train ODG engineers and certify enterprise customer operators.

TWO GRANTED SOFTWARE COPYRIGHTS (OCTOBER 2026)

Registered Software Systems Held by Founder (Original Acquisition, All Rights)

S1 · Reg. No. 2026SR1024392 Cert. No. 18238673 · Granted 13 Oct 2026
Large-Scale Server Fault Self-Healing and Elastic Scheduling System for Internet Platforms V1.0

Governs the operating-side fault detection, graded severity evaluation, bounded 5-action remediation sequence, and auditable post-incident recording loop.

S2 · Reg. No. 2026SR1030308 Cert. No. 18244589 · Granted 14 Oct 2026
Intelligent Computing Resource Scheduling and Upgrade Management Platform for Large-Scale Server Infrastructure V1.0

Accompanied by a complete 20-page User Manual and Software Specification (Aug 2026) covering 5 functional groups: System Monitoring, Fault Diagnosis, Approval-Gated Self-Healing, Intelligent Resource Scheduling, and Log Management.